Contact Us
cs2@cs2.co.uk tel: 0333 2000 838
  • Home
  • Who We Are
    • About Us
    • Memberships, Accreditations and Frameworks
    • Meet The Team
    • Our History
  • What We Do
    • Our Services
    • Our Sectors
    • Construction Consultancy
      • New Build
      • Repair & Refurbishment
      • Project Monitoring
    • Building Surveying
      • Investment Surveys
      • Vendor Surveys
      • Building Inspection
      • Party Wall & Neighbourly Matters
      • Planned Preventative Maintenance
      • Expert Witness
      • Principal Designer
    • Dilapidations
      • Landlord Dilapidations
      • Tenant Dilapidations
    • Cost Consultancy
      • Cost Management
      • Bills of Quantities
      • Strategic Procurement & Contract Strategy
      • Whole Life Costing
      • Reinstatement Cost Assessments
      • Feasibility Assessments
    • Energy & Sustainability
      • Built Environment
      • ECO Technology
      • Sustainable Planning
      • Compliance Reports
    • Insurance Surveying
      • Defect Diagnostic
      • Cost Validation
      • Reinstatement Cost Assessments
    • PFI Contract Expiry
  • Projects & Case Studies
  • News & Events
  • Join Our Team
    • Working For Us
    • Current Vacancies
    • Graduate Opportunities
  • Contact Us
  • Home
  • Who We Are
    • About Us
    • Memberships, Accreditations and Frameworks
    • Meet The Team
    • Our History
  • What We Do
    • Our Services
    • Our Sectors
    • Construction Consultancy
      • New Build
      • Repair & Refurbishment
      • Project Monitoring
    • Building Surveying
      • Investment Surveys
      • Vendor Surveys
      • Building Inspection
      • Party Wall & Neighbourly Matters
      • Planned Preventative Maintenance
      • Expert Witness
      • Principal Designer
    • Dilapidations
      • Landlord Dilapidations
      • Tenant Dilapidations
    • Cost Consultancy
      • Cost Management
      • Bills of Quantities
      • Strategic Procurement & Contract Strategy
      • Whole Life Costing
      • Reinstatement Cost Assessments
      • Feasibility Assessments
    • Energy & Sustainability
      • Built Environment
      • ECO Technology
      • Sustainable Planning
      • Compliance Reports
    • Insurance Surveying
      • Defect Diagnostic
      • Cost Validation
      • Reinstatement Cost Assessments
    • PFI Contract Expiry
  • Projects & Case Studies
  • News & Events
  • Join Our Team
    • Working For Us
    • Current Vacancies
    • Graduate Opportunities
  • Contact Us
  • You are here:
  • Home
  • Need advice on R22 refrigerant?

Need advice on R22 refrigerant?

  • By David Jay
  • October 8, 2018
  • 1,978 views
  • air conditioning, Dilapidations, landlord, R22, Tenant

The issue surrounding R22 refrigerants and how they contribute to global warming has always been a subject of thorough debate. Since 1st January 2015 it has been illegal to use R22 in refrigeration, heat pump and air conditioning (AC) systems. AC systems are not able to be topped up with any R22, whether that be new, recycled or reclaimed. This means that if yours was installed prior to 2004, you must plan to replace it as soon as possible.

What are the options if you have R22 refrigeration in your property?

  1. Replace the cooling system with a modern AC unit which uses non-ozone depleting refrigerants resulting in a lower carbon footprint and improved efficiency and output.
  2. Use alternative modern refrigerants to top up your AC system. This can involve having to replace parts of the current AC system. However, using an alternative refrigerant which has not been designed for use in an R22 system may greatly reduce the efficiency of the system leading to poor performance and increased running costs. An increase in energy cost is something that both property owners and occupiers should look to avoid, particularly due to recent MEES Legislation which dictates properties with an EPC rating of below E can no longer be let by the landlord. Read more about MEES here.

Does this affect Landlord or Tenants? 

The key question for landlords and tenants is who will pay for the solution?
Both landlords and tenants will need to thoroughly consider the wording of their leases to establish who will meet the expense, with repair clauses and statutory compliance clauses being particularly relevant.

Current Tenants

  • Current tenants should take into account which party is responsible for the repair, improvement or replacement of AC equipment, as stated in your lease agreement. This may influence the decision as to whether or not to exercise a break option on your retail unit.
  • The issue of R22 refrigeration will affect dilapidations discussions at the expiry of leases. It is recommended to seek professional advice prior to any break option to ascertain your liability in regards to the repair, improvement or replacement of AC equipment and help to plan your exit strategy.

Prospective Tenants

  • For prospective tenants, repairing obligations will be relevant to discussions at the start of a lease. Advice from building surveying professionals, such as CS2, will inform you as to whether you should accept a full repairing obligation in respect of AC equipment or whether it is necessary to demand that the equipment be replaced before the lease commences.

Landlords

  • Landlords should assess their building portfolios to consider the presence of R22 refrigerants within their building stock, the state of their repair and plan courses of action to update and refurbish their building stock. This will ensure minimum liability during the dilapidations process and also ensure that your building stock adheres to legislative demands.
  • There is the possibility that a two- tier market for air conditioned premises could possibly emerge: with a divide between the rent achievable for premises with R22- dependent AC equipment and those premises without such equipment. A planned approach to dealing with the issue of R22 within your stock will ensure that you continue to achieve maximum yields from your investment properties.
  • In a multi-let building, the service charge provisions will determine if the costs of dealing with the problem can be recovered by the landlord from your tenants. It will be important whether the provisions allow for the costs of repair, improvement and/or replacement of any AC system to be charged to the tenants. However, what constitutes repair, improvement or replacement is not always clear. For example, if the AC equipment is still able to function, although not in the most energy-efficient way, does that mean it is in disrepair? Landlords may find that this becomes a contentious issue during dilapidations discussions over coming years.
  • When acquiring building stock it will be important that you take into account R22 air conditioning as part of your pre-acquisition due diligence so that you are fully informed as to the extent of necessary repair of refurbishment that is required.

If you are aware of the presence of R22 refrigerants within your property and need further advice on how to take action, then get in touch with CS2’s Dilapidations experts David Jay  and Adam Bardell.

0 Comments

Search
Recent Posts
  • CS2 Wins Community and Sustainability Award 2024 for St Basils Coventry Project
  • Acquisition and significant revamp project to inject new life into Manchester’s largest office building
  • Navigating The Impact of Rising Interest Rates on Project Investments
  • Embodied Carbon: New Build vs Renovation
  • CS2 Hold Their Annual Conference at Ashridge House
Categories
  • Events (88)
  • Graduates (4)
  • News (116)
  • Viewpoint (175)
Tags
asset Awards Birmingham Bristol Building Business change Charity Community construction CS2 Dilapidations energy Event Events Fundraising Industry Investors landlord Legislation local Logistics London Manchester Milton Keynes MIPIM networking news Northampton Occupiers Office portfolio Project Management property Quiz recruitment Retail Sponsor Staff Sustainability team Tenant Trusted Advisor UK volunteering
What we do
  • Construction Consultancy
  • Building Surveying
  • Dilapidations
  • Cost Consultancy
  • Energy & Sustainability

ESOS Phase II is coming... Does your business qualify?

Previous thumb

CS2 are Sposoring the Northamptonshire Business of the Year Award 2018

Next thumb
Scroll
What We Do
  • Construction Consultancy
  • Building Surveying
  • Dilapidations
  • Cost Consultancy
  • Energy & Sustainability
Search
Sectors
  • Retail
  • Residential Investor Development
  • Offices
  • Industrial & Logistics
  • Education
  • Student Accommodation
  • Automotive
Follow us on Twitter
Tweets by CS2_Surveyors
® 2021 CS2 | Company Registration no. 03888977 | Chartered Surveyors Regulated by RICS

Sitemap | Cookies | Our Policies | Designed and Developed by Mau Media

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies. However, you may visit "Cookie Settings" to provide a controlled consent.
Cookie SettingsAccept All
Manage consent

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the ...
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
CookieDurationDescription
cookielawinfo-checkbox-analytics11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional11 monthsThe cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance11 monthsThis cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy11 monthsThe cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
  • Home
  • Who We Are
    • About Us
    • Memberships, Accreditations and Frameworks
    • Meet The Team
    • Our History
  • What We Do
    • Our Services
    • Our Sectors
    • Construction Consultancy
      • New Build
      • Repair & Refurbishment
      • Project Monitoring
    • Building Surveying
      • Investment Surveys
      • Vendor Surveys
      • Building Inspection
      • Party Wall & Neighbourly Matters
      • Planned Preventative Maintenance
      • Expert Witness
      • Principal Designer
    • Dilapidations
      • Landlord Dilapidations
      • Tenant Dilapidations
    • Cost Consultancy
      • Cost Management
      • Bills of Quantities
      • Strategic Procurement & Contract Strategy
      • Whole Life Costing
      • Reinstatement Cost Assessments
      • Feasibility Assessments
    • Energy & Sustainability
      • Built Environment
      • ECO Technology
      • Sustainable Planning
      • Compliance Reports
    • Insurance Surveying
      • Defect Diagnostic
      • Cost Validation
      • Reinstatement Cost Assessments
    • PFI Contract Expiry
  • Projects & Case Studies
  • News & Events
  • Join Our Team
    • Working For Us
    • Current Vacancies
    • Graduate Opportunities
  • Contact Us